20 Ton Overhead Crane

20 Ton 23 M H-16 M Grab Bucket Double Girder Overhead Crane for Sale to Steel Mill in India

20 Ton 23 M H-16 M Grab Bucket Double Girder Overhead Crane for Sale to Steel Mill in India 20 Ton 23 M H-16 M Grab Bucket Double Girder Overhead Crane for Sale to Steel Mill in India 20 Ton 23 M H-16 M Grab Bucket Double Girder Overhead Crane for Sale to Steel Mill in India 20 Ton 23 M H-16 M Grab Bucket Double Girder Overhead Crane for Sale to Steel Mill in India 20 Ton 23 M H-16 M Grab Bucket Double Girder Overhead Crane for Sale to Steel Mill in India 20 Ton 23 M H-16 M Grab Bucket Double Girder Overhead Crane for Sale to Steel Mill in India 20 Ton 23 M H-16 M Grab Bucket Double Girder Overhead Crane for Sale to Steel Mill in India

Lifting Capacity: 20 ton
Span: 23 m
Lifting Height: 16 m
Working Class: A7
Note: We can design and manufacture the crane according your requirments and working conditions.

Get Price

Send Email

20 Ton 23 M H-16 M Grab Bucket Double Girder Overhead Crane for Sale to Steel Mill in India:

A large steel recycling and raw material processing company in India contacted our engineering department while upgrading its scrap handling system inside a newly expanded steel mill. The customer mainly processed bulk steel scrap, iron ore additives, and recycled metal materials used for furnace charging operations.  

After several rounds of technical communication and workflow analysis, the customer selected a 20 ton grab bucket double girder overhead crane designed specifically for high-frequency bulk material handling inside demanding industrial environments.

  • Capacity: 20 ton
  • Span: 23 M
  • Lifting height: 16 M
  • Working class: A7
  • Main structure: Box section
  • Control method: Cabin control
  • Lifting tool: Grab bucket
  • Lifting speed: 40.7m/min
  • Lifting power: 75KW
  • Crane travelling Speed: 89m/min
  • Trolley travelling Speed: 45.6m/min
  • Power supply: 415V 50Hz
  • Ambient temperature: -10~48℃

The steel mill in India operated almost continuously, with raw materials moving from unloading zones to storage pits and furnace feeding areas throughout the day. One of the customer’s biggest challenges was improving the efficiency of scrap transfer while maintaining stable operation under dusty and high-temperature workshop conditions.

The 23-meter span of the 20 ton grab bucket overhead crane allowed the crane to fully cover the raw material storage bay and scrap feeding area. The 16-meter lifting height was carefully selected because the customer stacked large quantities of metal scrap inside deep storage zones before transferring materials into the furnace charging system.

Unlike standard hook cranes, this project required a grab bucket lifting solution capable of handling loose bulk materials efficiently. The 20 ton grab bucket double girder overhead crane used a heavy-duty grab bucket system that improved loading efficiency and reduced manual handling inside the workshop.

Another important requirement from the customer in India involved continuous operation under intensive workloads. The crane was therefore configured with an A7 working class suitable for frequent lifting cycles and long operating hours commonly found in steel production environments.

The high lifting speed of 40.7 m/min and trolley travelling speed of 45.6 m/min significantly improved scrap handling efficiency. In practice, the steel mill needed fast movement between storage areas and furnace charging positions to prevent production bottlenecks. The 20 ton grab bucket overhead crane provided the operating speed necessary for continuous material supply.

The customer also preferred cabin control instead of remote operation because operators needed clear visibility of the grab bucket during scrap loading. Our engineering team optimized the cabin position to improve visibility while reducing operator fatigue during long working shifts.

The box-section main girder structure of the 20 ton grab bucket double girder overhead crane provided excellent rigidity and long-term structural durability under continuous heavy-duty operation. The customer specifically requested a reinforced structure because the crane would operate in a harsh steel mill environment with frequent shock loading.

After arrival at the steel mill in India, installation was completed with support from the customer’s local engineering team and remote guidance from our technical department. Commissioning included synchronization testing, grab bucket calibration, and full-load operational trials.

Several weeks after startup, the customer reported that the 20 ton double girder overhead crane significantly improved raw material handling efficiency and reduced furnace charging delays. Operators in India also noted smoother crane movement and more stable grab bucket positioning compared with the previous equipment.

Production of 20 Ton Grab Bucket Double Girder Overhead Crane:

Production of 20 Ton Grab Bucket Double Girder Overhead Crane
Production of 20 Ton Grab Bucket Double Girder Overhead Crane
Production of 20 Ton Grab Bucket Double Girder Overhead Crane
Production of 20 Ton Grab Bucket Double Girder Overhead Crane
Production of 20 Ton Grab Bucket Double Girder Overhead Crane
Production of 20 Ton Grab Bucket Double Girder Overhead Crane
Production of 20 Ton Grab Bucket Double Girder Overhead Crane
Production of 20 Ton Grab Bucket Double Girder Overhead Crane
Production of 20 Ton Grab Bucket Double Girder Overhead Crane

Main Parts of 20 Ton Grab Bucket Double Girder Overhead Crane:

  • Crane wheel
  • Trolley wheel
  • Crane travelling motor
  • Trolley travelling motor
  • Lifting motor
  • Open and closing motor
  • Drum group

Protection Devices of 20 Ton Grab Bucket Double Girder Overhead Crane:

  • Crane travelling limiter
  • Trolley travelling limiter
  • Crane buffer
  • Trolley buffer
  • Load cell
  • Height limiter
  • Trolley brake
  • Crane brake
  • Opening and closing brake
  • Lifting brake
  • Weight limit
Accessories of 20 Ton Grab Bucket Double Girder Overhead Crane
Accessories of 20 Ton Grab Bucket Double Girder Overhead Crane
Accessories of 20 Ton Grab Bucket Double Girder Overhead Crane
Accessories of 20 Ton Grab Bucket Double Girder Overhead Crane
Accessories of 20 Ton Grab Bucket Double Girder Overhead Crane
Accessories of 20 Ton Grab Bucket Double Girder Overhead Crane
Accessories of 20 Ton Grab Bucket Double Girder Overhead Crane
Accessories of 20 Ton Grab Bucket Double Girder Overhead Crane
Accessories of 20 Ton Grab Bucket Double Girder Overhead Crane
Accessories of 20 Ton Grab Bucket Double Girder Overhead Crane
Accessories of 20 Ton Grab Bucket Double Girder Overhead Crane
Accessories of 20 Ton Grab Bucket Double Girder Overhead Crane
Accessories of 20 Ton Grab Bucket Double Girder Overhead Crane
Accessories of 20 Ton Grab Bucket Double Girder Overhead Crane
Accessories of 20 Ton Grab Bucket Double Girder Overhead Crane
Accessories of 20 Ton Grab Bucket Double Girder Overhead Crane

Why Is the 20 Ton Grab Bucket Double Girder Overhead Crane Widely Used in India’s Steel Recycling Industry?

The steel recycling industry in India has expanded rapidly due to increasing demand for recycled metal materials in construction, automotive manufacturing, and infrastructure projects. In many recycling yards and steel mills, the 20 ton grab bucket double girder overhead crane has become an important solution for handling bulk scrap materials efficiently.

Steel recycling facilities often process mixed scrap metal, shredded steel, and industrial waste materials that must move continuously between unloading areas, storage pits, and furnace charging systems. A 20 ton grab bucket overhead crane allows operators to transfer large quantities of scrap quickly while improving overall production flow.

One of the biggest advantages of the 20 ton double girder overhead crane is its high working efficiency during continuous operation. Many steel plants operate long production shifts and require stable material handling systems capable of supporting high-frequency lifting cycles.

The grab bucket mechanism also improves loading speed compared with standard hook lifting systems. Instead of handling materials individually, operators can move bulk scrap in larger volumes during each lifting cycle.

Another important reason companies in India choose the 20 ton overhead crane is workshop safety. Overhead transport systems reduce forklift congestion and minimize manual material handling inside difficult industrial environments.

The double girder structure additionally improves operational stability when handling dense or irregular scrap materials. This becomes especially important in steel mills where continuous heavy-duty operation is required.

How Does a 20 Ton Grab Bucket Double Girder Overhead Crane Improve Furnace Charging Efficiency in India?

Modern steel plants in India depend heavily on efficient furnace charging systems to maintain continuous production schedules. In these environments, the 20 ton grab bucket overhead crane plays a major role in improving raw material transfer efficiency.

Steel mills frequently handle loose scrap metal, iron additives, and recycled steel materials that must move rapidly from storage zones to furnace charging areas. A 20 ton double girder overhead crane allows operators to transfer these materials quickly while maintaining stable handling performance.

One important advantage is reduced loading time. The grab bucket system enables large volumes of scrap to be moved during each operating cycle, helping improve furnace feeding continuity.

The double girder structure of the 20 ton grab bucket overhead crane also provides better load balance and smoother movement during high-speed operation. This helps improve safety and positioning accuracy inside demanding steel mill environments.

Another benefit is improved production coordination. Many steel facilities in India operate multiple processing lines simultaneously, requiring reliable overhead material handling systems capable of supporting continuous industrial workloads.

Industrial operators additionally appreciate the crane’s suitability for dusty and high-temperature operating conditions commonly found inside steel plants.

Package of 20 Ton Grab Bucket Double Girder Overhead Crane:

Package of 20 Ton Grab Bucket Double Girder Overhead Crane
Package of 20 Ton Grab Bucket Double Girder Overhead Crane
Package of 20 Ton Grab Bucket Double Girder Overhead Crane
Package of 20 Ton Grab Bucket Double Girder Overhead Crane
Package of 20 Ton Grab Bucket Double Girder Overhead Crane
Package of 20 Ton Grab Bucket Double Girder Overhead Crane

What Should Indian Steel Mills Consider Before Installing a 20 Ton Grab Bucket Double Girder Overhead Crane?

Before purchasing a 20 ton grab bucket double girder overhead crane, steel mills in India should evaluate several important operational and structural factors.

The first consideration is material type. Different scrap materials require different grab bucket configurations depending on density, size, and handling frequency. A properly configured 20 ton grab bucket overhead crane improves loading efficiency and reduces unnecessary equipment wear.

Steel plants should also evaluate working class requirements carefully. Facilities operating continuously under high-frequency lifting conditions often require heavy-duty crane configurations designed for intensive industrial use.

Workshop dimensions are another important factor. The span and lifting height of the 20 ton double girder overhead crane must match storage pit layouts, furnace charging systems, and workshop structure.

Electrical protection is equally important in steel production environments. Many steel mills operate under high dust levels and elevated temperatures, requiring reinforced electrical systems and reliable motor protection.

The double girder structure also provides additional stability during high-speed operation of the grab bucket system. This improves safety and long-term durability during continuous material handling cycles. 

Why Is the 20 Ton Grab Bucket Double Girder Overhead Crane Suitable for India’s Bulk Material Handling Industry?

Bulk material handling remains one of the most important industrial activities in India, especially in steel manufacturing, recycling, mining support, and raw material processing industries. In these sectors, the 20 ton grab bucket double girder overhead crane is widely used for efficient transport of loose industrial materials.

Facilities often process steel scrap, iron ore additives, coal-related materials, and industrial waste products requiring continuous overhead movement. A 20 ton grab bucket overhead crane improves workflow efficiency by reducing manual loading operations and increasing material transfer speed.

One major advantage is high handling efficiency for loose materials. The grab bucket system allows operators to collect and transport large quantities of bulk material quickly during each cycle.

Another practical benefit is improved workshop organization. Overhead lifting systems reduce floor congestion and help create safer movement paths for vehicles and workers inside industrial facilities.

Companies in India also value the long-term durability of double girder crane systems. Heavy-duty structures provide stable operation under demanding industrial workloads and continuous production schedules.

How Does the 20 Ton Grab Bucket Double Girder Overhead Crane Support Industrial Modernization in India?

Industrial modernization has become an important trend across manufacturing and steel production sectors in India. As factories improve automation and production efficiency, the 20 ton grab bucket overhead crane continues to play a critical role in bulk material handling operations.

Steel mills and recycling facilities require reliable lifting systems capable of handling large quantities of loose scrap materials under continuous operating conditions. A 20 ton double girder overhead crane provides the speed, stability, and durability necessary for these demanding environments.

One important advantage is improved workflow integration. The crane can operate alongside furnace charging systems, conveyor lines, and automated storage areas to support continuous industrial production.

The double girder structure improves load stability during high-speed movement, while the grab bucket mechanism increases handling efficiency for irregular bulk materials.

Industrial operators in India also benefit from reduced dependence on ground transport equipment. Overhead material handling systems improve workshop organization and reduce operational interruptions.

Transportation of 20 Ton Grab Bucket Double Girder Overhead Crane:

Transportation of 20 Ton Grab Bucket Double Girder Overhead Crane
Transportation of 20 Ton Grab Bucket Double Girder Overhead Crane
Transportation of 20 Ton Grab Bucket Double Girder Overhead Crane
Transportation of 20 Ton Grab Bucket Double Girder Overhead Crane

Get Free Quotation

Please leave us the required Crane specification for Quick Quotation.

Contact
Chat
Whatsapp
Email
720 VR
Send Your Needsx

Please leave us the required Crane specification for Quick Quotation.





Chat on Whatsappx

Whatsapp: +86-15225185279

Top